Heritage · Concrete cancer · FaçadeCricketers Arms Hotel — Est. 1921Surry Hills, NSW · Heritage · Class 6 licensed venueFull heritage façade restoration on an active licensed pub. Concrete cancer, render failure and parapet repair — delivered while the bistro stayed open seven days.Open project photos
Structural failure · Piling · Government24 unitsLidcombe — 24 Unit Apartment BuildingLidcombe, NSW · Government-owned · Class 2 · 24 unitsStructural failure to blade walls and footings of a government-owned 24-unit apartment building. Emergency propping, controlled demolition, new piles and footings, full rebuild under heavy-duty propping — residents managed safely throughout.Open project photos
Emergency structural · Heritage · Fit-out167 George Street, Windsor — 1879 Heritage RescueWindsor, NSW · Heritage-listed · c.1879An 1870s building on the verge of collapse — front wall failing, public safety at risk. Emergency approvals secured within days, building stabilised, then taken through full heritage repair and reopened as a wellness centre with an exceptional fit-out.Open project photos
Demolition & rebuild · Heritage façade · Compliance recovery6 unitsDouble Bay — 6 Unit Heritage Rebuild (Buronga)Double Bay, NSW · Heritage conservation area · 6 unitsSix-apartment heritage building stopped halfway by authorities for non-compliant materials and defects. Heritage controls required the original front and side walls to remain — so we engineered a controlled demolition of everything behind them, kept the façade standing on temporary works, and rebuilt six luxury apartments inside.Open project photos
Structural remediation · Façade · Fit-outMaroubra — Full Unit Block RenovationMaroubra, NSW · Class 2 residential — unit blockFull renovation of an aging Maroubra unit block — structural remediation, complete façade update and fit-out across every unit. Aging stock transformed into modern residential accommodation.Open project photos
Sandstone masonry · Conservation finishKenso Apartments — Feature Sandstone EntryKensington, NSW · Class 2 residential — feature entryFeature sandstone entry wall construction at Kenso Apartments. Sandstone block laying, mortar selection and joint finishing to conservation standard.Open project photos
Design & build · Heritage-style new homeHurlstone Park — California Bungalow Design & BuildHurlstone Park, NSW · Class 1 residential — design & buildDesign and build of a new California Bungalow style home in Hurlstone Park, with full interior fit-out including stone bathroom and contemporary services behind a period-correct façade.Open project photos
Water ingress · Waterproofing · Live Board412 unitsGeorge Street, Sydney — 412-unit towerSydney CBD, NSW · Class 2 residential · 412 units · client confidentialBuilding-wide water ingress investigation and remediation across a 412-unit George Street tower. Every apartment surveyed, every defect colour-coded on a Live Board the strata committee, building manager and engineer watch in real time.Open project photos
Building maintenance · Planned works · Live Board398 unitsZetland Residences — Building maintenance programZetland, NSW · Class 2 residential · 398 unitsLong-term building maintenance program across a 398-unit Zetland tower. Planned cyclical works, fast-response defect rectification, and a Live Board the strata committee uses to track every job from request to sign-off.Open project photos
Concrete cancer · Façade · Interior refurbishment32 Orwell Street, Potts Point — Concrete Cancer & Apartment RefurbPotts Point, NSW · Class 2 residential · Art-Deco character buildingConcrete cancer rectification to the structural slab edges and columns of an Art-Deco apartment building off Orwell Lane, paired with a full interior refurbishment of affected apartments — kitchens, bathrooms and finishes brought back to a contemporary standard behind the retained streetscape.Open project photos